Today I’m talking with Josh Dzieza, a longtime features writer here at The Verge, about Kevin O’Leary’s plans to build a massive data center in Utah. The idea was to build the world’s biggest data center — a 40,000-acre AI campus with nine gigawat...
VQV Signal
Inside our months-long investigation into Kevin O’Leary’s Utah data center debacle
Today I’m talking with Josh Dzieza, a longtime features writer here at The Verge, about Kevin O’Leary’s plans to build a massive data center in Utah. The idea was to build the world’s biggest data center — a 40,000-acre AI campus with nine gigawat...
Today I’m talking with Josh Dzieza, a longtime features writer here at The Verge, about Kevin O’Leary’s plans to build a massive data center in Utah. The idea was to build the world’s biggest data center — a 40,000-acre AI campus with nine gigawatts of power, or more than double the average power usage of […]
VQV organizes public signals from inspectable sources. It does not independently verify the underlying report.
Signal Strength reflects source quality, relevance, freshness and evidence. Public Interest helps organize discovery; it is not proof of truth.
Public Interest components
VQV surfaced this signal because it is recent, relevant to AI Search, connected to The Verge AI.
No login, cookies, social SDKs, or automatic posting.